Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo
Konferencijski prilog (Objavljena verzija)
Metapodaci
Prikaz svih podataka o dokumentuApstrakt
The paper presents the technical solution for the foundation of the facilities of the
Boiler House for the energy utilization of waste and chimneys. Next to the boiler house, the
construction of a Bunker for waste storage is planned, which is founded at a depth of 6.0m below
the top of the boiler house's base plate. Based on the conditions of limited settlement, the
foundation of the boiler house was envisioned on drilled piles, while a hidden pile wall was
designed to protect the foundation pit of the bunker, which has the function of preventing large
deformations of the boiler house structure and does not jeopardize its stability. Calculations of the
bearing capacity of the piles based on the soil parameters from the geotechnical study are
presented, as well as the results of the pile tests with axial vertical pressure force.
Ključne reči:
piles / pile wall / bearing capacity of piles / static load test of pilesIzvor:
GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja, 2023, 364-371Finansiranje / projekti:
- Ministarstvo nauke, tehnološkog razvoja i inovacija Republike Srbije, institucionalno finansiranje - 200012 (Institut za ispitivanje materijala Srbije - IMS, Beograd) (RS-MESTD-inst-2020-200012)
Institucija/grupa
Institut za ispitivanje materijalaTY - CONF AU - Krstić, Marija AU - Božović, Nikola AU - Milićević, Rajo AU - Đoković, Ksenija PY - 2023 UR - http://rims.institutims.rs/handle/123456789/675 AB - The paper presents the technical solution for the foundation of the facilities of the Boiler House for the energy utilization of waste and chimneys. Next to the boiler house, the construction of a Bunker for waste storage is planned, which is founded at a depth of 6.0m below the top of the boiler house's base plate. Based on the conditions of limited settlement, the foundation of the boiler house was envisioned on drilled piles, while a hidden pile wall was designed to protect the foundation pit of the bunker, which has the function of preventing large deformations of the boiler house structure and does not jeopardize its stability. Calculations of the bearing capacity of the piles based on the soil parameters from the geotechnical study are presented, as well as the results of the pile tests with axial vertical pressure force. C3 - GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja T1 - Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo EP - 371 SP - 364 UR - https://hdl.handle.net/21.15107/rcub_rims_675 ER -
@conference{ author = "Krstić, Marija and Božović, Nikola and Milićević, Rajo and Đoković, Ksenija", year = "2023", abstract = "The paper presents the technical solution for the foundation of the facilities of the Boiler House for the energy utilization of waste and chimneys. Next to the boiler house, the construction of a Bunker for waste storage is planned, which is founded at a depth of 6.0m below the top of the boiler house's base plate. Based on the conditions of limited settlement, the foundation of the boiler house was envisioned on drilled piles, while a hidden pile wall was designed to protect the foundation pit of the bunker, which has the function of preventing large deformations of the boiler house structure and does not jeopardize its stability. Calculations of the bearing capacity of the piles based on the soil parameters from the geotechnical study are presented, as well as the results of the pile tests with axial vertical pressure force.", journal = "GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja", title = "Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo", pages = "371-364", url = "https://hdl.handle.net/21.15107/rcub_rims_675" }
Krstić, M., Božović, N., Milićević, R.,& Đoković, K.. (2023). Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo. in GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja, 364-371. https://hdl.handle.net/21.15107/rcub_rims_675
Krstić M, Božović N, Milićević R, Đoković K. Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo. in GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja. 2023;:364-371. https://hdl.handle.net/21.15107/rcub_rims_675 .
Krstić, Marija, Božović, Nikola, Milićević, Rajo, Đoković, Ksenija, "Technical solution for the foundation of the elixire group waste to energy treatment in Prahovo" in GEOTECHNICAL ASPECTS OF CIVIL ENGINEERING AND EARTHQUAKE ENGINEERING - Vrnjačka Banja (2023):364-371, https://hdl.handle.net/21.15107/rcub_rims_675 .