Претраживање
Приказ резултата 1-10 од 19
Concrete mix design for reconstruction of northwest breakwater in the Tripoli harbour - Libya
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2011)
Reconstruction of Northwest breakwater in the Tripoli Harbour - Libya (about 4500 m long) required manufacture of various concrete elements (cubes and accropodes) in total amount of 550 000 m(3). Volumes of cubes were 6,3 ...
Izbor optimalnog dodatnog materijala za reparaturno zavarivanje vratila turbine hidrocentrale na licu mesta / Selection of the optimal filler material for on-site repair welding of the turbine shaft at the hydropower plant
(DUZS - Društvo za unapređivanje zavarivanja u Srbiji, Beograd, 2011)
Najznačajniji delovi hidroelektrana, vratila turbina izložena su tokom rada visokim naprezanjima, puzamju, zamoru i koroziji. Zbog toga je korisno preduprediti oštećenja tokom rada, povećati pouzdanost i produžiti radni ...
Ekonomsko-finansijski instrumenti ekološke politike racionalnog korišćenja mineralnih resursa
(II Simpozijum sa međunarodnim učešćem "Rudarstvo 2011", Zbornik radova, 2011)
Mineralni resursi pripadaju širokoj grupi neobnovljivih resursa, prvenstveno zbog toga što je za njihovo stvaranje potrebno više miliona godina. S obzirom da prilikom eksploatacije i procesiranja mineralnih resursa dolazi ...
Elektrofilterski pepeo kao potencijalna sirovina za proizvodnju građevinskih materijala i keramike
(SRTOR VI - 6th Symposium “Recycling Technologies and Sustainable Development with International Participation” / 6. Simpozijum “Reciklažne tehnologije i održivi razvoj”, Zbornik radova, Soko Banja, Srbija, 2011)
Microstructure and characterisation of quality water pipes after 50 years in service
(Masinski fakultet, Kragujevac, Srbija, 2011)
SolidWorks used for the process of optimization of supporting structure of a pressure vessel
(VIII INTERNATIONAL CONGRESS MACHINЕS, TECHNOLОGIES, MATERIALS, Varna, Bulgaria, 2011)
According to the new regulations of the European Community (Directive 97/23/EC, design and manufacture of the pressure
vessels (PV) shall be in accordance with legal and technical regulations stating the application of ...
Engineering geological evaluation of the conditions for constructing a bridge and a tunnel in the zone of the old Petrovaradin Fortress, Serbia
(Springer, 2011)
The paper discusses the geotechnical conditions related to the construction of a new bridge over the Danube and a tunnel passing beneath the Petrovaradin Fortress at Novi Sad, Serbia. Analyses showed that both the bridge ...
Establishment and quantification of corrosion-induced damages of protective steel pipes in oil industry
(Velenje Coal Mine, Slovenija, 2011)
Compress u funkciji ocene integriteta opreme pod pritiskom
(Tehnološki fakultet, Zvornik, Bosna i Hercegovina, 2011)