Приказ основних података о документу

dc.creatorĐogo, Mitar
dc.creatorVasić, Milinko
dc.creatorĆosić, Mladen
dc.date.accessioned2023-11-06T10:44:34Z
dc.date.available2023-11-06T10:44:34Z
dc.date.issued2011
dc.identifier.issn1435-9537
dc.identifier.urihttp://rims.institutims.rs/handle/123456789/622
dc.description.abstractThe paper discusses the geotechnical conditions related to the construction of a new bridge over the Danube and a tunnel passing beneath the Petrovaradin Fortress at Novi Sad, Serbia. Analyses showed that both the bridge and the tunnel could be built without causing damage to any of the historical structures and that it would better to build two 8 m wide tunnels than a single 16 m wide structure. One of the two tunnels will involve the widening of an existing one, whereas the other will be newly constructed. The evidence suggests that the new bridge can be built on the reinforced piers of a bridge which was destroyed in World War II.sr
dc.language.isoensr
dc.publisherSpringersr
dc.rightsopenAccesssr
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.sourceBulletin of Engineering Geology and the Environmentsr
dc.titleEngineering geological evaluation of the conditions for constructing a bridge and a tunnel in the zone of the old Petrovaradin Fortress, Serbiasr
dc.typearticlesr
dc.rights.licenseBYsr
dc.citation.epage142
dc.citation.issue1
dc.citation.spage139
dc.citation.volume70
dc.identifier.doi10.1007/s10064-010-0292-0
dc.type.versionpublishedVersionsr


Документи

ДатотекеВеличинаФорматПреглед

Уз овај запис нема датотека.

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу