Претраживање
Приказ резултата 31-32 од 32
Integrity assessment of regulation system pipeline elements in hydroelectric generating set a6 of hydro power plant 'djerdap 1'
(Institut za ispitivanje materijala, Beograd, 2016)
Vertical Kaplan turbines with nominal power of 176 MW manufactured in Russia are installed in 6 hydroelectric generating sets at hydro power plant 'Djerdap 1' (Kladovo, Serbia). Most of the components are made of materials ...
Determination of damage and repair methodology for the runner manhole of Kaplan turbine at the hydro power plant 'Djerdap 1'
(Institut za ispitivanje materijala, Beograd, 2016)
Results of non-destructive testing of the Kaplan turbine runner manhole welded structure are presented, on the basis of which the repair methodology is defined. During repair, the welding technology for elements of the ...